GTT has announced a new order for one LNG carrier.
This new ship will be built by South Korean shipbuilder, Daewoo Shipbuilding & Marine Engineering (DSME).
The LNG carrier, for Mitsui OSK Lines (MOL), is expected to be delivered in 2018.
The ship will be built with GTT’s NO96-GW technology, which allows an optimised boil-off rate of cargo LNG.
Adapted from press release by Katie Woodward




