The LNG bunkering vessel Cardissa was loaded at the dedicated small scale jetty while the ice-class Coral Energice was loaded at Jetty 1, one of two jetties that can handle both small and large scale LNG carriers. Simultaneously a record daily number of 12 LNG trailers/containers were loaded.
Since a dedicated third small scale LNG jetty and two automated LNG truckloading bays became operational in 2016 and 2017 respectively, Gate has reported a steady increase in its small scale LNG activities.




